← All guides

Mixed-Product First Order: Planning One 40 HC Container or Truck of Detergents

Detergent pouches packed in an open cardboard carton on a pallet. Illustration.

A mixed-product first order combines several detergents in one shipment. Arana Premium’s published terms state that the minimum order applies per shipment, not per product line: one 40 HC container by sea, with 27.5 metric tonnes loaded per container, or one truck by road, with 23 metric tonnes loaded. This guide shows how to plan such a load before you request a quotation.

How do you plan a mixed container or truck?

  1. Choose the shipment mode first. A 40 HC container by sea and a truck by road have different loading figures, so the plan starts from the mode.
  2. List every product and pack size on its own line. A 3 kg and a 9 kg pack of the same powder are two lines with different cartons.
  3. Split the load in tonnes. For example, a container plan could be 15 tonnes of powder detergent and 12.5 tonnes of liquid detergent. The split is yours; state it clearly.
  4. Confirm the loading in the quotation. Units per carton, carton dimensions and pallet layout are confirmed per product at quotation stage.

A load plan template

Line Product and pack Quantity To confirm in the quotation
1 Powder laundry detergent, pack size tonnes units per carton, carton size, gross weight
2 Liquid laundry detergent, fill volume tonnes units per carton, carton size, gross weight
3 Dishwashing liquid, fill volume tonnes units per carton, carton size, gross weight

Keep net product weight and gross weight separate. Freight planning uses gross weight, including retail packaging and outer cartons.

What to confirm in writing

The published terms do not cover these points. Confirm them in writing with Arana Premium before you place the order:

  • Which products and pack sizes can be combined in your shipment, and any minimum per product or pack size
  • Whether the 27.5 and 23 tonne figures refer to net product weight or gross weight
  • The pallet layout and who loads the goods at pickup

Next steps

Put your load plan into the first order brief, check cartons with the export packaging and carton planning guide and read how EXW Istanbul affects freight. The published terms are on the commercial terms page. Then request a quotation.

Explore the catalogue Request a product quote